<4. Installation>
4-1
IM 01C50B01-01E
4. Installation
IMPORTANT
When performing on-site pipe tting work that
involves welding, use care to prevent outow
of the welding current into the transmitter.
Do not use the transmitter as a foothold for
installation.
For details of choosing the installation location,
refer to the guidelines outlined in Section 2.4,
“Choosing the installation location”.
Th
e mounting bracket shown in Figure 4.1 is
used for the transmitter and is installed on 50A
(2B) pipe.
It can be installed either on a horizontal pipe
and a vertical pipe or on a wall.
To install the mounting bracket on the
transmitter, torque the transmitter lock screw (1)
to about 20 to 30N•m.
F0401.ai
Horizontal Pipe Mounting Vertical Pipe Mounting
U-bolt nut
Spring washer
Horizontal pipe
mounting bracket
U-bolt
Wall Mounting
Note: Wall mounting bolts are
user-supplied.
Transmitter
fastening bolt
U-bolt nut
Vertical pipe
mounting
bracket
Transmitter
fastening bolt
Spring washer
Spring washer
U-bolt
Bracket
fastening bolt
Bracket
fastening nut
• When using a horizontal pipe mounting bracket
• When using a vertical pipe mounting bracket
Figure 4.1 Mounting the Transmitter