Yokogawa ADMAG AXW Manual do Utilizador Página 16

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 15
<3. INSTALLATION>
3-7
IM 01E25D11-01EN
5. Install the owtube into the customer’s pipe
with the gaskets A.
F0314.ai
Hang the grounding
ring up with this point.
Unfasten the bolts and
remove the grounding rings.
Cut out some holes on the
gasket B when necessary.
Wire
Grounding Ring
Flowtube
Screw & Nut : Connect the wire from the
grounding ring or the customer’s pipe.
Note : Gasket A and B should be placed concentrically with
the owtube.
Figure 3.3.6 Mounting Procedure with Grounding
Rings GR1 for sizes 1100 mm (44 in.)
and above
Mounting Procedure (with optional
Grounding Rings GR2):
The grounding rings are installed and locked
onto the owtube with gaskets B when shipped
from factory. Install theowtube into the
customer’s pipe with gaskets A supplied by
customer.
(5) Tightening Nuts
Pass the bolts from pipe line side, not owtube side,
and tighten the bolts according to the torque values
for the metal piping in Table 3.3.1 or 3.3.2
CAUTION
Be sure to tighten the nuts according to the
prescribed toeque values. Tighten them
diagonally with the same torque values, step
by up to the prescribed torque value.
Vista de página 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 51 52

Comentários a estes Manuais

Sem comentários