Yokogawa DAQWORX Manual do Utilizador Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 52
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
2-5
IM WX1-03E
1
2
3
Index
Operating Procedure
Executing the Test
5.
Click the Test Execution button in the Tag Setting dialog box.
The test result is displayed in the value column.
Stopping the Test
6.
Click the Test Stop button.
Scan Interval and Retry Settings
Procedure
1.
Click the Scan Interval Setting tab or choose View > Scan Interval Setting from
the menu bar.
The Scan Interval Setting tab is displayed.
Scan Interval Settings
2.
Specify a scan interval from 0.5 to 3600 seconds.
Setting the Number of Retries
3.
Turn the communication retry setting ON or OFF.
4.
Enter the time interval between retries.
The available setting range is 30 to 3600 seconds.
Port Settings
Procedure
1.
Choose File > Port Number from the menu bar.
2.
You can change the port number used by the monitor server.
2.2 Entering Environment Settings
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 51 52

Comentários a estes Manuais

Sem comentários